Payment schedule and construction milestones
What is paid at each step of the build, and what you receive before each payment.
Your villa is paid in six steps that follow the site. Before each payment you receive dated photos of your lot, a short note from the site engineer and the invoice of the step.
- Reservation: 5% of the price, within 7 days. Not refundable; the lot is taken off the market while the contract is prepared.
- Sale contract: 25%, within 30 days of the reservation. The contract fixes the price of the model, the lot and the options, the planning and the delay clause.
- Foundations finished: 20%.
- Structure finished (walls, slabs and roof): 20%.
- Finishes finished (floors, tiles, kitchen, bathrooms, pool): 20%.
- Keys handed over: 10%, after the handover inspection and the signature of the list of defects.
Planning. The planning is indicative, about 18 months from the contract. A delay is handled as the clause of the contract says; our assistant never gives a delivery date or an amount.
Options. Options chosen after the contract are added by an amendment with their fixed price and paid with the next milestone.
Transfer. Fees and taxes at the Land Office are an indicative estimate until the Land Office calculates them on the day of the transfer.